Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0812-0019-E]
Application
2 Process-Overhead Cranes in a concrete factory
Country
Czech Republic
City
Dolní Buèice
Representative office
Conductix-Wampfler s.r.o.
Operator
GOLDBECK Prefabeton, s.r.o.
Technical requirement [s]
Main power supply for the Process-Overhead Cranes
Product
Conductor Rail "Program 0812"
Track length [System]
2 x 246 m
Quantity of poles
3 + PE
Sytem course
Linear
Power
320 A
Voltage
400 V
Travel distance [Load]
1 x 246 m and 1 x 226 m
Travel speed [Load]
600 m/min
Environmental condition [s]
- 25 °C up to + 45 °C
Additional information [s]
Power supply for the crabs of the Process-Overhead Cranes was realized with the C-Rail Festoon System of Conductix-Wampfler.
Single pole conductor rail preferably for straight tracks.
Special features
Main applications
Standard application data
Installation Instructions